The construction project is the general renovation of the primary and secondary school in
Höchstädt (Danube). This building is the part of the building from the 60s and its extension from the 90s.
Both parts of the building have a basement and extend
over a total of 4 floors. (KG, ground floor, 1st floor, 2nd floor)
LV 312/1 Metal and locksmith work
Site equipment:
-construction site facility
Fire doors:
- Metallrahmentüren 105m²
- Continuous protection glass 19m²
- Feststelleinrichtung 9 St
Metallbauarbeiten:
- Handrail 48 m
- Railing incl. handrail 46m
- Steel system staircase incl. railing/handrail 1 pcs.