Geothermal power station construction work | Tenderlake

Geothermal power station construction work

Contract Value:
EUR 36M - 36M
Notice Type:
Contract Notice
Published Date:
05 May 2023
Closing Date:
11 July 2023
Location(s):
PT200 Região Autónoma dos Açores (PT PORTUGAL)
Description:
Contract for the design, construction, supply, assembly, testing and commissioning of the Pico Vermelho Geothermal Power Plant Expansion from 10 to 11 MW

Contract for the design, construction, supply, assembly, testing and commissioning of the Pico Vermelho Geothermal Power Plant Expansion from 10 to 11 MW

The tender refers to the supply of the preparation of the design, manufacture, transport, insurance and assembly of electrical and mechanical equipment and civil construction works, testing and entry into service, training and training of personnel for the construction of the expansion of the Pico Vermelho Geothermal Power Plant, within the framework of the installation of a generator set with a total net power of 10 to 11 MW and auxiliary equipment, efficiently using the geothermal resource available, the construction of the Technical Building to support the operation of the plant, as well as the works related to the safety and quality of the equipment performed and other supplies and complementary services.

Download full details as .pdf
The Buyer:
EDA Renováveis, S. A.
CPV Code(s):
45251141 - Geothermal power station construction work