Construction of a new workshop building for the departments of construction, painting and personal care north of the existing workshop building.
The new building will be built as a reinforced concrete solid construction with ETICS façade and wood-aluminium element windows according to valid EnEV with flat roof construction.
1 St. Niederspanungshauptverteilung
1 St. Blindstromkompensationsanlage
ca. 3 St. Einzelstandschrank
ca. 3 St. Kleinverteiler
ca. 10 St. Feldverteiler
approx. 100 pcs. residual current circuit breakers
approx. 400 pcs. miniature circuit breakers
approx. 30,000 m sheathed cables / cables
ca. 1.500 St. Installationsgeräte
approx. 500 pcs. LED luminaires Installation, surface-mounting, pendulum
1 pcs each emergency lighting, KNS, ELA, HW system