The investigation will be conducted to the west of the existing developed terminal, both onshore (on land reclaimed as part of the initial port construction works, which took place between 2010 and 2014) on offshore (starting at a bed level of c. -14,5 m CD). The investigation will include the following:
— mobilisation of all necessary onshore and offshore plant,
— onshore and offshore boreholes including full core recovery and documentation of cores,
— in-situ geotechnical testing,
— CPTs,
— laboratory geotechnical and chemical testing,
— reporting.
The investigation will include the following:
— mobilisation of all necessary onshore and offshore plant,
— onshore and offshore boreholes including full core recovery and documentation of cores,
— in-situ geotechnical testing,
— CPTs,
— laboratory geotechnical and chemical testing,
— reporting.