Works of installation of an ice rink in constrained environment. The work will be done in a giant recreation center. The market is a global market, not alloti. Technical lots are however identified:
- lot 1 - structural work,
- lot 2 - wood structure,
- Lot No 3 - Locksmithing - Metalwork,
- lot 4 - partition - doublings - plaster ceilings,
- lot 5 - interior joinery - bleachers,
- Lot No 6 - false ceilings,
- Lot No 7 - soft floors,
- Lot No 8 - Tiles - Faience,
- lot 9 - paintings,
- lot 10a - ice rink equipment - cold / hot slab - cold network,
- lot 10b - cold / hot slab - cold network,
- lot 11 - lockers - cabins,
- lot 12 - electricity - CFO-CFA,
- lot 13 - HVAC - plumbing and cold production,
- lot nº 14 - elevator.
Works of installation of an ice rink in constrained environment. The work will be done in a Giant Recreation Center. The market is a global market, not alloti. Technical lots are however identified:
- lot 1 - structural work,
- lot 2 - wood structure,
- Lot No 3 - Locksmithing - Metalwork,
- lot 4 - partition - doublings - plaster ceilings,
- lot 5 - interior joinery - bleachers,
- Lot No 6 - false ceilings,
- Lot No 7 - soft floors,
- Lot No 8 - Tiles - Faience,
- lot 9 - paintings,
- lot 10a - ice rink equipment - cold / hot slab - cold network,
- lot 10b - cold / hot slab - cold network,
- lot 11 - lockers - cabins,
- lot 12 - electricity - CFO-CFA,
- lot 13 - HVAC - plumbing and cold production,
- lot nº 14 - elevator.