Carpentry work - built-in furniture for the 1st phase of the general renovation of the primary / secondary school Margetshöchheim
Carpentry work - built-in furniture 1st phase of the general renovation of the elementary/middle school
Peripher/ gross masses from LV
Floor-to-ceiling built-in wardrobes under ceiling-hung ventilation unit 8 pcs.
Open shelves with longitudinal bracing with diagonals made of steel bars and clamping ring 14 pcs.
Multi-part shelves with back panel 6 pcs.
Floor-to-ceiling built-in wardrobe with mailboxes, teacher's lockers and cloakroom locker 1 pc.
Window sills with lengths between 110 – 600 cm, approx. 220 running metres
Sockelverkleidung Heizleitungen ca. 34m
Clothing balustrade railings Gallery approx. 400 m²