the purpose of this framework agreement is the selection of energy suppliers who will be admitted to submit a tender upon publication of subsequent contracts (MS) for the supply and transmission of gas and/or electricity and associated services to supply the delivery points (Pdl - electricity) or the metering and estimation points (Pce - gas) of the members of the grouping
lot no. 1 electricity: Delivery points (Pdl) connected to Bt with a power less than or equal to 36 kva (C5)electricity - delivery points (Pdl) connected in Bt with power? 36 kVA (C5)
lot 2 electricity: Delivery points (Pdl) connected in Bt with a power greater than 36 kva (C4), in Hta with profiled load curve (C3), in Hta with measured load curve (C2)electricity - delivery points (Pdl):-Connected in Bt with a power > 36 kva (C4)-In Hta with profiled load curve (C3)-In Hta with measured load curve (C2)
Lot 3 gas: Gas counting and estimation pointsGas - Gas metering and estimation points