The city of Neuburg an der Donau is building 2 structures with a total of 27 apartments including an underground car park as part of the subsidized housing construction. In the course of the development of this measure, a noise protection wall will be built along an existing public field and forest path (öFW) at the top edge of the B 16 embankment. The noise protection wall is 72 m long, with a height of at least 2.50 m above the OK area. The noise barriers are to be offered and constructed in accordance with the ZTV-LSW guideline.
- Execution and inventory documents: 1psch;
- Construction pits: 25 m
- tubular steel piles: 60 m;
- Wall plinth in concrete: 65 m
- Wall element: 155 m