B 492, extension between Hermaringen and Brenz.
1) earthworks including foundations
Topsoil off and order including delivery = about 11 000 m
Upper floor disposal = approx. 12,000 m
Earthworks off and order including delivery = about 23 500 m
Earthquake disposal = about 61 000 m
2) Conventional road construction:
Asphalt layers 3 ply = approx. 20 500 m
Frost protection layers and gravel base layers = approx. 17,000 m
Commercial roads with substrate improvement 40 cm = approx. 13,500 m
Soak pipes = approx. 4 500 m
Amphibious guiding device with 22 small animal cross tunnels = approx. 4,200 m
3) foundation structure:
Rüttelstopfverdichtung (concrete gravel columns length iM 5.0 m) = about 28,500 m
Geogrid mattress longitudinal and transverse = approx. 32,000 m
Grain mixture for protection of the geogrid mattress = approx. 27,000 m