Metallbauarbeiten
Renewal of the railing of the hay bridge in Wassertrüdingen,
Demolition work: approx. 49 m railing inventory,
Engineering,
Production: Delivery and installation of a total of approx. 49 m railing / fall protection made of galvanized and colored coated steel for a slightly bent concrete bridge as a replacement new building.
Architecturally-free railing construction consisting of vertical lamellae-like, identical flat steel elements and transversely inserted handrail.