The subject of this EU announcement is the combined heat and power plant trade for phase II of the construction project Conversion & Renovation of the existing therapy and well-being center in D-08648 Bad Brambach. The other trades will be published in separate announcements.
Announcement text for CHP plant tender
1 CHP module, total output 204 kW
1 exhaust system
2 buffer tanks
approx. 100 m of steel pipe DN 20 — DN 100
approx. 100 m thermal insulation DN 20 — DN 100
Particularities:
Special measures for construction work in the healing spring protection area (healing water protection zones II) are required. Vehicles, machines and devices are operated with biofuels. If technically possible, hydraulic drives must be converted to bio-hydraulic oil.