Depots and workshops of the Berlin State Museums, F05 1.BA
Fürstenwalder Damm 388, 12587 Berlin-Friedrichshagen
1st phase of construction, 2nd part-EW construction
Heating and cooling supply systems - DIN 18380 - VE 41
Heating and cooling supply systems - DIN 18380 - VE 41
Scope:
The component of the overall construction project is the new construction of the heat supply systems and refrigeration systems. The construction will take place in one go and includes the equipment of the four-storey main building, as well as the single-storey gatekeeper building.
Heat supply systems
- approx. 5000 m steel pipe welded DN15 to DN100
- 2 heating distributors up to 60 m³/h
- 1 St. Druckhaltestation
- approx. 150 radiators and heating walls
- ca. 100 m Deckenstrahlplatten
- approx. 30 m² underfloor heating
- 2 heat exchangers 260 kW for district heating feed-in
Refrigeration systems
- 2 pcs chiller approx. 415 kW
- 3 pcs chiller approx. 100 kW
- 2 dry chillers approx. 500 kW
- 2 dry chillers approx. 250 kW
- 2 St. Pumpendruckhaltestation
- approx. 3500 m steel pipe welded DN15 to DN200
- 3 pcs distributor
- ca. 35 St- Umluftkühler
- approx. 13 units recirculating air coolers as rack coolers for server cooling
- 3 pcs 10 m³ buffer tank
- Roof installation substructure for dry coolers
- Gykol collection system for dry coolers
Maintenance services are part of the call for tenders - duration: 4 years
Start of execution:
03/2023
Execution end:
03/2024
Binding individual deadline