B 28, new building between Rottenburg and Tübingen, construction phase 2, road construction from Rottenburg-Kiebingen to Tübingen-Bühl.
Road construction:
- Ground movements approx. 57,000 m
- Milling work approx. 2 250 m
- Frost protection layers approx. 12,000 m
- Gravel base layers approx. 28,000 m
- Bituminous base layers approx. 27,500 m
- Bituminous binder courses approx. 23 500 m
- Bituminous top layers approx. 27 500 m
- Foil tray approx. 12 800 m
- Rain retention basin approx. 400 m
Building 4.1:
- Static system: reinforced concrete frame;
- Superstructure cross-sectional shape: slab;
- Span: 8.18 m;
- total length of the bridge: 8.18 m;
- construction height: 0.70 m;
- width between the railings: 11.60 m;
- Excavation pit approx. 510 m
- Concrete work approx. 265 m
- Reinforcing steel approx. 42.00 to;
- Steel railing approx. 45.00 m.