- Upgrading of the lift station:
◦ Removal of the upstream shut-off valve lift station and installation of a motorized wall valve, controllable via remote management inside the station including adaptation of the support
◦ Replacement of the 3 lifting pumps
- renovation of the technical room:
◦ Resumption of the waterproofing of the roof terrace of the room (with insulation) and barbicans
◦ Lighting upgrade of the entire technical room with emergency lighting
◦ Compliance of electrical cabinets, controls, anti-intrusion system
◦ Removal of the existing unit, installation of a new generator in the disused part of the room including the cooling and gas evacuation system, with fuel tank including construction of a fire partition, ventilation with sound traps
gc, Carpentry, Security- Upgrading of the lift station:
◦ Removal of the shut-off valve upstream of the lifting station and installation of a motorized wall valve, controllable via remote management inside the station including adaptation of the support
◦ Replacement of the 3 lifting pumps
- renovation of the technical room:
◦ Resumption of the waterproofing of the roof terrace of the room (with insulation) and barbicans
electricity- renovation of the technical room:
◦ Lighting upgrade of the entire technical room with emergency lighting
◦ Compliance of electrical cabinets, controls, anti-intrusion system
◦ Removal of the existing unit, installation of a new generator in the disused part of the room including the cooling and gas evacuation system, with fuel tank, ventilation with sound traps