Lot 35 Earthworks, drainage and shell construction works Terrace
Construction project: Conversion and renovation of Alte Post Leuna
Lot 35 Earthworks, drainage and shell construction works Terrace
The client, the housing industry Leuna GmbH, intends to extensively renovate and renovate the residential building. There are 31 low-barrier apartments on 3 floors (1.BOG/2.OG/ DG) and 6 commercial units on the ground floor.
The building is accessed via 2 stairwells, each with attached elevators. On the residential floors, the residential units are accessed via an internal corridor.
The building is located in the area of a designated area monument of the city of Leuna.
In the southern part of the building, a new terrace is to be built over existing garages. This terrace will then be landscaped as a community garden for the residents of the property.
The execution takes place in 2 construction phases. The construction phases are divided into an east and west area. The border is between the two garage complexes. The work is carried out with a small offset. Interruptions are also to be expected during the work.
Earthwork, drainage and shell construction work terrace
- 172 m² Betonpflaster Rückbauen
- 82 m Grundleitung Rückbauen
- Laying 82 m of new ground line incl. shaft work
- 1 concrete seepage shaft incl. shaft work
- 154 m³ strip foundations reinforced
- 1 piece of foundation grounding
- 398 m² dismantling of an old roof truss
- 6,583 kg steel girder as steel structure (supports)
- 16,560 kg steel beam as steel structure (beam)
- 450 m² Filigrandecke