Water pipe construction from the waterworks Impfingen (Tauberbischofsheim) to the Stürmershölzlein pumping station (Werbach). FA05-BA01.
Construction of DN 150, DN 250 and DN 300 water pipes (buried) including 1 shaft structure and parallel cable pit pipes with drawshafts.
- 3 parallel lines DN 150/300/150 GGG CMU, L = 2,090 m
- 2 parallel lines DN 250/150 GGG CMU, L = 1,025 m
- 1 line DN 250 GGG ZMU, L = 665 m
- penetration for road intersection
- open water crossing
- shaft structure 6.60 x 4.60 m
- laying cable pipes and ducts parallel to the water pipe