The overall project involves the renovation and extension of a three-field sports hall. The renovation concerns the roof surfaces, the façade surfaces and the interior fittings. In the course of the expansion, a single-storey extension will be built on the east side. On the south side, after the demolition of the old building, a new foyer area is being built for the main development of the three-field sports hall. The technical renovation concerns the heating, ventilation and sanitary facilities as well as the entire electrical engineering.
- 390 m² impact wall cladding made of spruce panels
- 170 m² pilaster cladding wood-based spruce panel
- 8 St. Gerätraumschwingtore
- 6 St. Sporthalleninnentüren
- 2 St. Sporthallenaußentüren