New construction of three apartment buildings with a total of 66 apartments.
Heat supply systems (abbreviation: ELB.18)ELB.18 Heat supply systems
Delivery and installation of a total of approx. 4,000m
approx. 240 core boreholes.
Medical and ventilation systems (abbreviation: ELB.19)ELB.19 Sanitary and ventilation systems
Delivery and installation of 76 washbasins and 76 toilets as well as associated assembly elements,
66 bodengl. Showers, 10 bathtubs, delivery and installation of 810m soundproofed drainage pipe, 950m sound-optimized sewage pipe, 40 flat roof hoods, 2,300m stainless steel drinking water pipes, 2,200m multi-layer composite pipe, associated thermal insulation,
146 single-room fans, 6 duct fan systems KG ventilation incl. dew point controls, 510m spiral seam pipe, 101 maintenance-free fire protection shut-off devices, 33 flat roof hoods ventilation, production of 840 core boreholes
Electrical installation (abbreviation: ELB.20)ELB.20 Electrical installation
Delivery and installation of 66 sub-distribution boards, 3 meter systems with transducer measurement, 1,530m plastic sheathed cable NYY 5x16mm
ELB.21 PV systems
Delivery, installation and commissioning of 3 PV systems with 34.4 kWp, 29.5 kWp and 29.5 kWp,
3 inverters with associated mounting racks
Landscaping work (abbreviation: ELB.22)- Parking space for 46 cars (concrete and grass joint pavement)
- Main access road with ramp in concrete pavement (including fire brigade access)
- House access roads and terraces (paving bricks, concrete slabs) a total of approx. 3,000 m
- Angle retaining walls approx. 75m and concrete wall blocks approx. 260 m for terrain interception
- Planting trees, hedges and perennials
- Lawns and meadows
a total of approx. 3,900 m
- Equipment and playground equipment
- Zaunarbeiten
- dewatering work