A 3 Nürnberg-Passau, 6-lane expansion from AK Regensburg to AS Rosenhof
Noise barrier on the Zieget.
- Noise protection wall areas 2 pieces,
- Noise barrier sections 4 pieces (BA 1, 2, 3 (West) and 3 (East)),
- Single wall lengths: BA 1: 262 m, BA 2: 108 m, BA 3 West: 30 m, BA 3 East: 28 m,
- total length: 428 m,
- System wall height: BA 1: 8.0 m, BA 2: 6.0 m, BA 3: 4.0 m to 7.2 m.
Version: BA 1: highly absorbent on both sides, BA 2: highly absorbent on the motorway side / reflective on the adjacent side, BA 3: transparent
Wall surface of noise barriers: BA 1: 2 096 m
Foundation: bored pile foundations, cap anchoring (already carried out by another contractor)
Demolition services: none
The services essentially include:
Earthwork: 55 m
Excavation excavation: not applicable
- Ballast base layer: 1 000 m
- Frost protection layer: 260 m
- bored piles (quiver potting only): 160 pieces,
- Anchoring on building cap (only anchor plate including tamping): 31 pieces,
- Wall base elements made of concrete: 231 m
- Concrete wall elements: 1,620 m
- Sound absorbing wallcovering made of wood: 990 m
- Reflective wooden wallcovering: 600 m
- Sound absorbing aerated concrete facing: 1,620 m
- LS elements made of acrylic glass: 1 060 m
- LS-LSG elements: 270 m
Demolition of existing wall: (already carried out by another contractor)