structural work
construction site equipment and protective measures,
Various demolition works including concrete floors and ceilings.
approx. 10.48 m3 of individual openings.
ca.16,3 m3 Wandabbruch,
Dismantling plasterboard, stairs, etc., various core drilling,
approx. 24 m3 floor cable ducts, approx. 66 m3 excavation pit,
approx. 150 m2 formwork, approx. 7 t structural steel,
Various built-in parts - elevator, various concreting work, perimeter insulation, various masonry work, approx. 140 m3 in-situ concrete,