“Receipt and processing of waste code 19 12 12 — other waste (including mixed substances and objects) from mechanical treatment of waste other than those listed in 19 12 11 originating in the ZUOK “Stary Las” Sp. z o.o.”
The subject of the contract is to perform a service consisting in the collection and processing of waste (recovery and/or disposal) code 19 12 12 — other waste (including mixed substances and objects) from mechanical treatment of waste other than those listed in 19 12 11 originating in the Disposal Plant Municipal waste “Old Forest” Sp. z o.o., waste in baled form or bulk.
The order is divided into parts.
Reception and processing of waste (recovery and/or disposal) code 19 12 12 from sorting municipal waste - baled wasteThe subject of the contract is the performance of a service consisting in the collection and processing of waste (recovery and/or disposal) code 19 12 12 — other waste (including mixed substances and objects) from mechanical treatment of waste other than those listed in 19 12 11, fraction with a diameter of more than 80 mm with sorting municipal waste, waste in baled form in the amount of 6,000 Mg.
The Ordering Party reserves the right of option to reduce the subject of the contract, depending on the specificity of the technical and technological solutions adopted in the production cycle, unforeseen changes in the quantities accepted for waste management or storage conditions, while the Ordering Party undertakes to transfer not less than 4,000 Mg of waste. 2 000 Mg of waste is the right of option.
Reception of waste:
(a) the transfer and collection of waste will take place from the area of the Municipal Installation [IK] in Stary Lesie 9, Starogard Gdański Municipality (83-200);
(b) the loading and collection of waste may be carried out on any day from Monday to Friday, excluding statutory days from 6:00 to 18:00;
(c) the collection shall be carried out by transport organised by the Contractor and at his expense, including the costs of carriage, insurance for the duration of transport and unloading;
(d) the loading of waste on vehicles substituted by the Contractor is the responsibility of the Contracting Authority;
(e) The Contractor shall provide loading with cars - for waste in baled form - “back- moving floor” or “side- curtain”;
(f) the waste received will be weighed on a car weight of up to 20 kg, located on the IK site. In order to determine the weight of the waste received, the Contractor's vehicle must be weighed before loading. The weight of the vehicle with loading shall not exceed 40 Mg;
(g) the result of the weighing shall be binding on settlements between the Parties;
(h) vehicles intended for the execution of the order may be vehicles with dimensions: spacing between front and rear axles max 14 m, wheelbase max to 3 m;
i) The Contractor bears sole responsibility for any damage, as well as for loss, loss and damage to waste, caused during the transport of waste from the moment of release in the CI and during storage, unloading of waste until it is subjected to and completion of recovery and/or disposal operations. The Contractor shall be liable in particular for the acts and omissions of its staff and entities used to perform the subject of the contract, e.g. transporting waste;
(j) upon issue of the waste, the Contractor shall pass upon him all the benefits and burdens associated with them and the danger of accidental loss or damage thereof, and in particular he shall assume responsibility for the waste issued, for the due handling and for the effects thereof.
Waste packaging - receipt of waste in balot form - the Ordering Party will make a packaging of the transferred waste, i.e. the waste will be compacted, formed into wire wrapped balots, an estimated volume of a single balot approx. 1 to 1.5 m3.
The Contracting Authority shall require an appropriate response time of not more than 2 working days (the time during which the Contractor will be ready to collect the waste — the time measured from the time of the transfer of the information to the Contractor by the Contractor and the substitution of the car for the loading of waste by the Contractor).
The Contracting Authority does not specify how to recover and/or dispose of the waste. It is up to the Contractor to determine the process by which it will be processed, excluding the D5 process.
Receipt and processing of waste (recovery and/or disposal) code 19 12 12 from sorting of municipal waste - bulk wasteThe subject of the contract is the performance of a service consisting in the collection and processing of waste (recovery and / or disposal) with the code 19 12 12 - other waste (including mixed substances and objects) from mechanical treatment of waste other than those mentioned in 19 12 11, fraction with a diameter of more than 80 mm from sorting municipal waste, bulk waste in the amount of 8 000 Mg.
The Ordering Party reserves the right of option to reduce the subject of the contract, depending on the specificity of the technical and technological solutions adopted in the production cycle, unforeseen changes in the quantities accepted for waste management or storage conditions, while the Ordering Party undertakes to transfer not less than 6,000 Mg of waste. 2 000 Mg of waste is the right of option.
Reception of waste:
(a) the transfer and collection of waste will take place from the area of the Municipal Installation [IK] in Stary Lesie 9, Starogard Gdański Municipality (83-200);
(b) the loading and collection of waste may be carried out on any day from Monday to Friday, excluding statutory days from 6:00 to 18:00;
(c) the collection shall be carried out by transport organised by the Contractor and at his expense, including the costs of carriage, insurance for the duration of transport and unloading;
(d) the loading of waste on vehicles substituted by the Contractor is the responsibility of the Contracting Authority;
e) The Contractor will provide loading with cars - for waste in loose form - loading “from above”;
(f) the waste received will be weighed on a car weight of up to 20 kg, located on the IK site. In order to determine the weight of the waste received, the Contractor's vehicle must be weighed before loading. The weight of the vehicle with loading shall not exceed 40 Mg;
(g) the result of the weighing shall be binding on settlements between the Parties;
(h) vehicles intended for the execution of the order may be vehicles with dimensions: spacing between front and rear axles max 14 m, wheelbase max to 3 m;
i) The Contractor bears sole responsibility for any damage, as well as for loss, loss and damage to waste, caused during the transport of waste from the moment of release in the CI and during storage, unloading of waste until it is subjected to and completion of recovery and/or disposal operations. The Contractor shall be liable in particular for the acts and omissions of its staff and entities used to perform the subject of the contract, e.g. transporting waste;
(j) upon issue of the waste, the Contractor shall pass upon him all the benefits and burdens associated with them and the danger of accidental loss or damage thereof, and in particular he shall assume responsibility for the waste issued, for the due handling and for the effects thereof.
Waste packaging - bulk waste collection.
The Contracting Authority shall require an appropriate response time of not more than 2 working days (the time during which the Contractor will be ready to collect the waste — the time measured from the time of the transfer of the information to the Contractor by the Contractor and the substitution of the car for the loading of waste by the Contractor).
The Contracting Authority does not specify how to recover and/or dispose of the waste. It is up to the Contractor to determine the process by which it will be processed, excluding the D5 process.