Bergen military training area (NATO), new construction of vehicle wash Hörsten, settling channel, washing area, road construction
earth movements (excavation and backfilling); reinforced concrete structures, including settling channel and pile driving beams; roads in concrete construction; asphalt roads; paved roads and paths; RW and SW ducts up to DN 300; RW and SW shafts; sewage pumping station; Drinking water pipeline DN 125; Trenches for cables (excavation and backfilling)