Lot 11 Electrical installation
New construction of electrical system (high and low current) in 2 construction phases with outbuildings and outdoor facilities.
- 1 transducer measuring system
- 9 circuit distributors
- 3250 m of pipes/ducts/cable trays metal
- 15650 m of power cables and wires
- 4200 m of low-voltage cables and wires
- 790 pieces of installation equipment
- 305 luminaires (exterior and interior lighting)
- Emergency lighting with 143 single-battery luminaires and monitoring device
- KNX lighting and sun protection system control 4 channel for 31 drives
- Door call system with main station and connection to PBX
- Data network with 1 data distribution cabinet and 47 port connections RJ45
- Fire alarm system with 87 detectors, 35 acoustic and 27 visual signaling devices, FIBS, FSD
- Intruder alarm system with 45 detectors and transmission device
- Public address system (amplifier, 2 loudspeakers, playback, 1 wireless microphone)
- Photovoltaic system 12 kWp
- Grounding and lightning protection system
- Construction power and construction lighting