Project study, invitation to tender for works, preparation of the execution documents and the local construction management (phases 31 to 53 of SIA 103) of the bicycle link project between Posieux and Villars-sur-Glâne.
The creation of a soil protection concept is also required.
Project study, invitation to tender for works, preparation of the execution documents and the local construction management (phases 31 to 53 of SIA 103) of the bicycle link project between Posieux and Villars-sur-Glâne.
The creation of a soil protection concept is also required.