Pipeline relaying works | Tenderlake

Pipeline relaying works

Contract Value:
EUR 5M - 5M
Notice Type:
Contract Notice
Published Date:
09 December 2022
Closing Date:
06 January 2023
Location(s):
DED53 Nordsachsen (DE Germany/DEUTSCHLAND)
Description:
WW Mockritz BA 9 Construction work: Renovation of pump hall, new construction of pressure surge system and adaptation of the outer pipelines

1.Sanierung Pumpenhalle

Services: pipe technical and structural renovation, pipe technology up to DN 800 in steel Rilsan, renewal of floors, steel construction for stairs, platforms and railings, coating of the outer wall, execution in two staggered construction phases within the construction period

2. New construction of pressure surge system

Civil engineering, reinforced concrete structure with sandwich roof (enclosed space 1,400 m³), steel construction for walkways and platforms, 4 pressurized shock boilers made of stainless steel – 30 m³ net capacity (PN 16/21), pipe technology up to DN 800 in steel Rilsan (PN 16/25), underpinning existing building and transformer room in jet blasting method, dewatering measures/ GW lowering

3. External pipelines, temporary arrangements, dismantling

underground pipelines including interim pipeline, dewatering / GW subsidence, dismantling of various facilities, restoration/renewal of outdoor facilities

1. Renovation of pump hall,

• Renewal of the pumping stations in the machine hall of the WW Mockritz

North ring with 2,100 m³/h, 4 pumps provided – nominal pressure PN 16,

South ring with 2,000 m³/h, 4 pumps provided – nominal pressure PN 25

• Services: pipe technical and structural rehabilitation, pipe technology up to DN 800 in Stahl-Rilsan

• Renewal of floors, steel construction for stairs, platforms and railings, coating of exterior wall

• Execution in two staggered construction phases within the construction period

2. New construction of pressure surge system

• Civil engineering, reinforced concrete structure with sandwich roof (enclosed space 1,400 m³)

• Steel construction for catwalks and platforms

• 4 pressure jackets made of stainless steel – 30 m³ net capacity (PN 16/21)

• Pipe technology up to DN 800 in steel Rilsan (PN 16/25)

• Underpinning of existing building and transformer room in the jet blasting process

• Dewatering measures / GW lowering

3. External pipelines, temporary arrangements, dismantling

• 220 m DN 800/1,000 (steel, ZMA, PE-U) PN 16 Nordring or PN 25 Südring, each buried

• 220 m DN 200 PE-HD (process water + glass), each buried

• 150 m Interimsleitung DN 400, PN 16 (erdverlegt)

• Dewatering measures / GW lowering

• Interim pumping station Südring (realization with existing pumps)

• Dismantling of hydrophric plants of North and South Ring

• Dismantling of various shafts in the route area

• Restoration / renewal of the outdoor facilities

Download full details as .pdf
The Buyer:
Fernwasserversorgung Elbaue-Ostharz GmbH
CPV Code(s):
44615100 - Steel pressure vessels
45110000 - Building demolition and wrecking work and earthmoving work
45112000 - Excavating and earthmoving work
45200000 - Works for complete or part construction and civil engineering work
45231000 - Construction work for pipelines, communication and power lines
45231113 - Pipeline relaying works
45232152 - Pumping station construction work
45262300 - Concrete work
45262700 - Building alteration work