Wastewater pumping station | Tenderlake

Wastewater pumping station

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 July 2019
Closing Date:
12 August 2019
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DEF SCHLESWIG-HOLSTEIN (DE Germany/DEUTSCHLAND)
DEF0 Schleswig-Holstein (DE Germany/DEUTSCHLAND)
DEF07 Nordfriesland (DE Germany/DEUTSCHLAND)
Description:
Conversion of sewage pumping station at Brünk u. New construction of sewage pumping station Frischwassertal in List a. Sylt

Conversion of a sewage pumping station with construction of a shaft pumping station (Lot 1: Am Brünk) and construction of a sewage pumping station in shaft construction (Lot 2: Frischwassertal), shaft diameter: approx. 3 m each, shaft depth: approx. 11 m, wastewater volume flow approx. 50 l / s at about 28 mWs; 18-22 kW. Lower shaft construction, equipment with pumps, piping, fittings and E / MSR technology. Additionally: construction of underfloor thermal filters for the exhaust air purification.


Lot 1: Manhole pumping station at Brünk

New construction of a shaft pumping station, shaft diameter: approx. 3 m, shaft depth: approx. 11 m, shaft: plastic-coated reinforced concrete, flow rate: approx. 50 l / s at approx. 25 mWs, approx. 18.5 kW.


Lot 2: manhole pumping station Frischwassertal

New construction of a shaft pumping station, shaft diameter: approx. 3 m, shaft depth: approx. 11 m, shaft: plastic-coated reinforced concrete, flow rate: approx. 52 l / s at approx. 27 mWs, approx. 22 kW.

Download full details as .pdf
The Buyer:
Energieversorgung Sylt GmbH
CPV Code(s):
45232431 - Wastewater pumping station