Stadibau GmbH is planning the new construction of a residential building on the site of Linprunstraße 19 in Munich. Linprunstraße 19 will be built in the 1st construction phase followed by the redevelopment of Linprunstraße 13.
District heating transfer station 100 kW, buffer cylinder 500 L, automatic Pressure maintenance, 290 m heating piping DN 15- DN 65 including insulation, pack of 5 UWP and fittings, underfloor heating, stat. radiator for Trh's, electric Bathroom radiators (auxiliary heater to the FBH) Floor-mounted distributor 1-field, automation station with approx. 100 data points, actuators and sensors for autonomous FW transfer with 3 control loops and 2 pcs. ABL system, fault messages, software, remote hook-up, system visualization, cabling