In the course of the construction of a multi-purpose hall, the specialty canal construction includes the following services in particular:
- Demolition and disposal of RW / SW sewers (approx. 50 m DN250 / DN150 each) including concrete shafts (3 pieces);
- New installation of RW pipes (approx. 50 m PP up to DN 250 including 3 shafts and 8 m
- Construction of an angled retaining wall (1 to 3.5 m high) including necessary earthworks.
The earthworks in the lot cover approximately 275 m
As before.