The following measures are planned for the TUTC building, which are to be carried out essentially in parallel:
- Replacement of the existing plastic facade cladding for a non-flammable aluminum cladding,
- Renewal of the roof structures and the roof drains, production of emergency drainage,
- Increase in the load capacity of the facade access system,
- Repair of the entrance platform of the main entrance area,
- Repair / renewal of flanking components (e.g. suspended ceilings),
- concrete repair measures,
- installation of a photovoltaic system,
- Renewal of the external sun protection.
The overall measure is divided into the 2 construction phases BA 1 and BA 2. The construction phase BA 1 comprises the entire eastern and the entire western extension, as well as the parts of the high-rise building adjacent to the extensions, including the entrance platform. The construction phase BA 2 comprises the high-rise building from the parapet of the 1st floor to the roof.
The tendered construction work essentially comprises the following measures:
- Creation of a work plan for the external blinds and the control system,
- dismantling of the existing external blinds,
- Installation of new electrically driven external blinds in existing panels,
- Installation of a central, wind-dependent control using a bus system.
The following characteristics must be retained when renewing the facade cladding:
- arrangement of the external blinds as in the existing building,
- rail guide,
- Color shades in coordination with the lower monument protection authority.