Joint task Improving the Regional Economic Structure (GRW)
Tourism development of the GRW-Infra 09/18 Botanical Museum, BAFA project no. 48/11/5009,
Here: drywall work
Joint task Improving the Regional Economic Structure (GRW)
Tourist development of the Botanical Museum GRW-Infra 09/18, Bafa-Projekt-Nr.48/11/5009
The building is a historical monument.
Here: drywall work
-Scaffolding for your own performance Working height up to 9.60 m
-Sampling of sloping ceilings
-296 m2 GK column walls F0 and F90 as single and double column movement
-95 m2 Free-standing attachment shells as A GK stand movement
-Manufacture of openings in GK column walls
-690 m grouting
-20 St Universaltraversen
-20 pc inspection flaps 40x40 to 70x70 cm
-128 m2 Suspended GK ceiling, F0 and F90, Q2
-257 m2 Suspended, seamless, acoustic ceiling, d=25 mm
-1 PC partition wall system with 3 cabins