Infrastructure, new construction project RTZ Buschland
Construction site installation. 5,000 hrs/week
Protective fence movable plastic H 1m set up clearing 180,000 m
Protective fence movable plastic H 1m 2.700,000 m/wk
Pavement concrete composite pavement D 80mm roadway demolition loading transp. Dispose of trucks AN 1.775,000 m2
Demolition and disposal of on-board equipment, stones (high, round and low curbs) 1,420,000 m
Sewer PP-MD DN250 SN8 trench installed T 1,25-1,75m 127,000 m
Pressure pipe PE100 TW DN/OD32 SDR11 Trench sloped T up to 1.25m 105,000 m
Kabel NYCWY 4x185SM/95 vorh. Trench/cable duct shape 83,000 m
Ground trench cable ducts loosen load transp. Dispose of truck AN Sole B 0.5-0.6m T to 1.25m GW GE GU SU SU* 42.5000 m3
STS Bk1,8 DPr1,03 EV2 150MPa 0/45 D 15cm 1.060,000 m2
Asphalttragschicht Bk1,8 AC32TN Bindem. 50/70 D 12cm 980,000 m2
Allowance, excavated soil sewer / road construction / excavation pits >Z1 - <= Z 1.1 dispose of, HB 1 and 2 2,185,000 m3
Cable conduit plastic supply 2pipes side by side 150,000 m