The contract concerns the executive design, works for the ground installation, operation and maintenance of a photovoltaic plant with a power of 5.2 MWp, to be built on the north-east side of the Milan Linate airport grounds, based on tracking technology, with mono-crystalline, bi-facial, anti-glare modules
Restricted procedure for the assignment of the executive design, installation, operation and maintenance of a photovoltaic plant with a power of 5.2 MWp to be built on the north-east side of the Milan Linate airport grounds, based on tracking technology, with mono-crystalline, bi-facial, anti-reflective modules (CIG. no. A02B3249B8). The contract is awarded on the basis of a technical and economic feasibility project drawn up by a third-party economic operator. For more details on the activities included in the contract, please refer to the General Technical Report and the Descriptive Report attached to this announcement