Delivery, installation and commissioning of the loudspeakers and cable networks in the T2 and GSH area during ongoing terminal operation as a replacement for the existing loudspeakers.
As part of the generation change of the ELA systems of Terminal 2 and baggage sorting hall, the loudspeakers and cable networks must be updated. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks shall be completely converted to A/B cabling; all loudspeakers are to be replaced and partially supplemented.
The client is aware that there have been sharp price increases and supply bottlenecks for individual products and materials. Following an initial significant increase in material prices, an easing can currently be observed. In order to deal with volatile prices in the procurement of materials and also supply bottlenecks properly in the present procurement procedure, bidders can use the initial offer via a negotiated offer to name the items in the specifications for which, in their opinion, flexibility is required due to the current situation is necessary and submit their proposals for such flexibility, e.g. a price adjustment clause.
Details on the course of the procurement procedure and the content of services can be found in the informative procurement documents (see point I.3 of the contract notice).
ELA T2 - Loudspeakers and wiring networksAs part of the generation change of the ELA systems of Terminal 2 and baggage sorting hall, the loudspeakers and cable networks must be updated. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks shall be completely converted to A/B cabling; all speakers are to be replaced and partly. to supplement.
The services are to be carried out during ongoing airport operations and therefore essentially converted into night work. The work is mainly carried out in the safe area of the airport.
The associated ELA central technology according to EN 54-16 and others is the subject of a separate tender (2021-1003075).
The services concern the entire Terminal 2.
Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the nightly conversion phases).
ELA GSH - Loudspeakers and wiring networksAs part of the generation change of the ELA systems of Terminal 2 and baggage sorting hall, the loudspeakers and cable networks must be updated. The plants are to be built in accordance with LAR and EN 54-24. The pipeline networks shall be completely converted to A/B cabling; all speakers are to be replaced and partly. to supplement.
The services are to be carried out during ongoing airport operations and therefore essentially converted into night work. The work is mainly carried out in the safe area of the airport.
The associated ELA central technology according to EN 54-16 and others is the subject of a separate tender (2021-1003075).
The services concern the entire baggage sorting hall (without satellite).
Continuous readiness for announcements for alarms and operational announcements is required (with the exception of the nightly conversion phases).