Work has been ongoing for several years to clarify measures so that Kvadraturen school centre has a satisfactory inside climate.
The Norwegian Labour Inspection Authority inspected building B at the school on 11.2.2015. Several shortcomings in the building's climate installations were pointed out at the inspection. The school was given the task of mapping the situation, establishing a plan of measures for immediate improvements, and establishing plans for future permanent measures for improvements.
On 10.3.2015, the Norwegian Labour Inspection Authority ordered a presentation of the mapping, a risk assessment of the inside climate, and participation from the safety delegate.
On 1.9.2016 the Norwegian Labour Inspection Authority approved a compulsory fine so that the school would see to the previous orders. A deadline for the measures was set to 28.8.2016.
Vest-Agder County replied to the Norwegian Labour Inspection Authority's previous orders in a separate letter dated 22.12.2016. Different measures and a progress plan for the measures were presented in this letter.
Work has been ongoing for several years to clarify measures so that Kvadraturen school centre has a satisfactory inside climate.
The Norwegian Labour Inspection Authority inspected building B at the school on 11.2.2015. Several shortcomings in the building's climate installations were pointed out at the inspection. The school was given the task of mapping the situation, establishing a plan of measures for immediate improvements, and establishing plans for future permanent measures for improvements.
On 10.3.2015, the Norwegian Labour Inspection Authority ordered a presentation of the mapping, a risk assessment of the inside climate, and participation from the safety delegate.
On 1.9.2016 the Norwegian Labour Inspection Authority approved a compulsory fine so that the school would see to the previous orders. A deadline for the measures was set to 28.8.2016.
Vest-Agder County replied to the Norwegian Labour Inspection Authority's previous orders in a separate letter dated 22.12.2016. Different measures and a progress plan for the measures were presented in this letter. A lot of this has been carried out. The remaining measures are covered by this general contract.
In addition to this, equivalent improvements for building A are also included, as this dates from the same period. The current users must move due to the planned measures in large parts of the school. This has been carried out as “preparatory work”, and is only included in this general contract to a small degree.
However, there will be areas where the general contract will have interface with previous work, which will give a fully upgraded building.