The subject of the order is the preparation of design documentation for a high pressure gas station and a design for a medium pressure gas network in the cities of Szumowo and Żabikowo, voivodeship Podlasie divided into 2 tasks (parts).
Task 1 (part 1) - Preparation of a construction design, detailed design and supervision of the author's high pressure gas station with a capacity of Q = 10,000 Nm
The deadline for completing the order for task 1 (lot 1) - no longer than 12 months from the date of signing the contract.
A detailed description of the subject of the contract is specified in the Terms of Reference with attachments available at: https://zamowienia.psgaz.pl
Sentence 2 (part 2) - execution of the construction design, detailed design and author's supervision for the DN250 medium pressure gas pipeline debt about 55m, DN225 long about 1 980m, DN160 long about 438m, DN125 long about 5 385m, DN90 long about 3 255m and DN 63 long around 1,610m in the town of Szumowo, ul. Kozłowski, Przemysłowa, Przedziecki, Leśna, Szkolna and others and the city of Żabikowo (according to the graphic attachment). Shut-off fittings should be designed for gas pipelines. The works should be carried out in accordance with the technical conditions No. PSGBI / ZMSM / G / 038/19 of 24.6.2019, constituting an attachment to the ToR.
The deadline for the implementation of task 2 (part 2) - no longer than 12 months from the date of signing the contract.
A detailed description of the order is set out in the Terms of Reference with attachments available at: https://zamowienia.psgaz.pl