Drilling and exploration work | Tenderlake

Drilling and exploration work

Contract Value:
EUR 159M - 159M
Notice Type:
Contract Notice
Published Date:
29 January 2024
Closing Date:
23 February 2024
Location(s):
FR102 Seine-et-Marne (FR FRANCE)
FR103 Yvelines (FR FRANCE)
FR104 Essonne (FR FRANCE)
FR105 Hauts-de-Seine (FR FRANCE)
FR106 Seine-Saint-Denis (FR FRANCE)
FR107 Val-de-Marne (FR FRANCE)
FR108 Val-d'Oise (FR FRANCE)
FRB01 Cher (FR FRANCE)
FRB02 Eure-et-Loir (FR FRANCE)
FRB03 Indre (FR FRANCE)
FRB04 Indre-et-Loire (FR FRANCE)
FRB05 Loir-et-Cher (FR FRANCE)
FRB06 Loiret (FR FRANCE)
FRC11 Côte-d’Or (FR FRANCE)
FRC12 Nièvre (FR FRANCE)
FRC13 Saône-et-Loire (FR FRANCE)
FRC14 Yonne (FR FRANCE)
FRC21 Doubs (FR FRANCE)
FRC22 Jura (FR FRANCE)
FRC23 Haute-Saône (FR FRANCE)
FRC24 Territoire de Belfort (FR FRANCE)
FRD11 Calvados (FR FRANCE)
FRD12 Manche (FR FRANCE)
FRD13 Orne (FR FRANCE)
FRD21 Eure (FR FRANCE)
FRD22 Seine-Maritime (FR FRANCE)
FRE11 Nord (FR FRANCE)
FRE12 Pas-de-Calais (FR FRANCE)
FRE21 Aisne (FR FRANCE)
FRE22 Oise (FR FRANCE)
FRE23 Somme (FR FRANCE)
FRF11 Bas-Rhin (FR FRANCE)
FRF12 Haut-Rhin (FR FRANCE)
FRF21 Ardennes (FR FRANCE)
FRF22 Aube (FR FRANCE)
FRF23 Marne (FR FRANCE)
FRF24 Haute-Marne (FR FRANCE)
FRF31 Meurthe-et-Moselle (FR FRANCE)
FRF32 Meuse (FR FRANCE)
FRF33 Moselle (FR FRANCE)
FRF34 Vosges (FR FRANCE)
FRG01 Loire-Atlantique (FR FRANCE)
FRG02 Maine-et-Loire (FR FRANCE)
FRG03 Mayenne (FR FRANCE)
FRG04 Sarthe (FR FRANCE)
FRG05 Vendée (FR FRANCE)
FRH01 Côtes-d’Armor (FR FRANCE)
FRH02 Finistère (FR FRANCE)
FRH03 Ille-et-Vilaine (FR FRANCE)
FRH04 Morbihan (FR FRANCE)
FRI11 Dordogne (FR FRANCE)
FRI12 Gironde (FR FRANCE)
FRI13 Landes (FR FRANCE)
FRI14 Lot-et-Garonne (FR FRANCE)
FRI15 Pyrénées-Atlantiques (FR FRANCE)
FRI21 Corrèze (FR FRANCE)
FRI22 Creuse (FR FRANCE)
FRI23 Haute-Vienne (FR FRANCE)
FRI31 Charente (FR FRANCE)
FRI32 Charente-Maritime (FR FRANCE)
FRI33 Deux-Sèvres (FR FRANCE)
FRI34 Vienne (FR FRANCE)
FRJ11 Aude (FR FRANCE)
FRJ12 Gard (FR FRANCE)
FRJ13 Hérault (FR FRANCE)
FRJ15 Pyrénées-Orientales (FR FRANCE)
FRJ21 Ariège (FR FRANCE)
FRJ22 Aveyron (FR FRANCE)
FRJ23 Haute-Garonne (FR FRANCE)
FRJ24 Gers (FR FRANCE)
FRJ25 Lot (FR FRANCE)
FRJ26 Hautes-Pyrénées (FR FRANCE)
FRJ27 Tarn (FR FRANCE)
FRJ28 Tarn-et-Garonne (FR FRANCE)
FRK11 Allier (FR FRANCE)
FRK12 Cantal (FR FRANCE)
FRK13 Haute-Loire (FR FRANCE)
FRK14 Puy-de-Dôme (FR FRANCE)
FRK21 Ain (FR FRANCE)
FRK22 Ardèche (FR FRANCE)
FRK23 Drôme (FR FRANCE)
FRK24 Isère (FR FRANCE)
FRK25 Loire (FR FRANCE)
FRK26 Rhône (FR FRANCE)
FRK27 Savoie (FR FRANCE)
FRK28 Haute-Savoie (FR FRANCE)
FRL01 Alpes-de-Haute-Provence (FR FRANCE)
FRL02 Hautes-Alpes (FR FRANCE)
FRL03 Alpes-Maritimes (FR FRANCE)
FRL04 Bouches-du-Rhône (FR FRANCE)
FRL05 Var (FR FRANCE)
FRL06 Vaucluse (FR FRANCE)
Description:
Contract for directional drilling works and associated studies, including boreholes and soil studies, for various regional directorates.
Contracts, studies and grouped works, Enedis Directional Drilling 2025-2028

Contract for 24 Enedis Regions (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Alps

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts studies and grouped works Directional drilling 2025-2028 Regional Directorate Ile de France Est

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts studies and grouped works Directional drilling 2025-2028 Regional Directorate Ile de France Ouest

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Languedoc Roussillon Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Limousin Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Lorraine Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Midi-Pyrénées Sud

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Direction Régionale Nord Midi-Pyrénées

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Nord Pas de Calais Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works, Directional Drilling 2025-2028, Normandy Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Regional Directorate Pays de la Loire

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Regional Directorate Alsace Franche Comté

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Picardy Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works, directional drilling 2025-2028, Poitou-Charentes Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Regional Directorate Provence Alpes du Sud

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Pyrénées Landes

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Sillon Rhodanien

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Aquitaine Nord Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional Drilling 2025-2028 Auvergne Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Burgundy Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Brittany

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Centre Val de Loire

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Regional Directorate Champagne Ardenne

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Contracts, studies and grouped works Directional drilling 2025-2028 Côte d'Azur Regional Directorate

Contract for directional drilling works (excluding complex crossings SNCF and Voies Navigables France) and associated studies:

- Directional boreholes with a length of 30 m to a maximum of 250 m

- Soil studies for directional drilling: G1, G2 AVP or G2 pro

Preparation of the preliminary technical file,

Possible feasibility study

Soil study for G1, G2 AVP or G2 PRO directional boreholes,

Possible detection of sensitive networks not classified as A

Organization and participation in pre-work meetings,

Submission of execution file

Information for local authorities and network operators,

Regulatory marking of networks before work

Carrying out entrance and exit searches,

Carrying out pilot drilling,

The bore of the pilot borehole to the dimensions adapted to the diameter of the tube or sleeve to be laid, The supply and welding of the barrel,

The installation of the barrel (including unwinding if the duct is packed in drums), the switching of a duct left on hold after completion

Waste management (drilling fluid, mud, ,..) and disposal in a collection site corresponding to the regulatory classification of type 3 (ISDI). Otherwise, (ISDND Class 2 and ISDD Class 1), the Account Holder shall submit to the Company a corresponding invoice as well as the Waste Tracking Slip,

All constraints related to the drilling of the borehole (water supply and drainage in particular),

The realization of the Geo-referenced Plan of the Constructed Structure of the duct laid by directional drilling, with the corresponding profile in class A.

Refurbishment and refurbishment of entrance and exit areas

Application Limitations:

All directional drilling

• Not related to the installation of networks,

• Less than 30m in length or more than 250m in length,

• Railway sub-track dedicated to passenger transport,

• Sub-watercourses with a width of more than 100m from bank to bank,

• With sea or river exit (landing),

• With casing,

• With a pressure limit of more than 300 MPa or a particle size of more than 300 mm,

• With a firing depth of more than 18m,

• Whose guidance mode is an "Optitrack" gyroscopic guidance, imposed by the environment, by a manager or by electromagnetic disturbances,

• Whose number of scabbards in the same shot (for the same borehole) is greater than 4,

• The use of trenchless techniques other than directional drilling, such as auger drilling, pipe pushing, micro-drilling, micro-tunnelling, etc.

Download full details as .pdf
The Buyer:
Enedis
CPV Code(s):
45255500 - Drilling and exploration work