Electrical installation.
Execution of the electrical installation in a detention center in a correctional facility, construction sections, components Stern, east and south wings.
Consisting of:
- 1 pc. UPS 80 kVA,
- 1 pc central battery system 62 Ah with,
- 2 pcs substations E30,
- 2 main building distributions up to 630 A,
- 86 St. floor / sub-distributions,
- 50m NYY-J 4x185,
- 6 500 m cable to NYCWY 4 x 120/95,
- 15 400 m lines up to 5 x 6,
- 1 050 m underground corridor,
- 210 m parapet canal,
- 440 St. Detention room luminaires LED up to 4 500 lm,
- 410 St. LED lights up to 7 500 lm,
- 3 St. RWA control panels.
Attention: Product specifications in position range 1.3.