Telematic open procedure for the assignment of urgent purging works with recovery of the full reservoir capacity of the Lorgana, Garda and Menata collectors and optimization of the pumping system for irrigation purposes Saiarino and Vallesanta drainage plants in the Municipality of Argenta – P01428 / PI – Lot 2 – Purging collectors on the left and right Idice and complementary works.
(Intervention funded by the "European Union – Next Generation EU", under the PNRR (National Recovery and Resilience Plan), Annex 1 of the M.I.M.S. Decree n. 517 of 16/12/2021, measure M2C4 – I4.1 "Investments in primary water infrastructures for the security of water supply" – INTERVENTION CODE PNRR- M2C4-I4.1-A1-2)
The object of the contract consists in the recovery of part of the original reservoir capacity of the Lorgana drain and other canals through the removal of a share of sediments deposited on the bottom of the canals over decades of operation.
The intervention also involves the replacement of the Ghinghero channel with a new tube system consisting of two pipes laid using TOC (Controlled Horizontal Drilling) technology parallel to the existing channel layout.