Restart of the 6 unallocated lots during the 1
The overall deadline for the execution of all the services is 15 months (2 months for the preparation period and 13 months for the execution of the works), starting from the service order of lot 01 carcass work, to know the 19.12.2018. The period of execution of the works is 13 months (+ 2 months for the preparation period) and starts from the order of service of the batch 01 carcass work, namely 19.12.2018. It therefore ends on 18.3.2020.
Railing or handrail: 990 ml;
Block of metal doors: 35 units;
Metal structure, OM local wall screed: 180 m
Pergolas: 80 m
Door unit: 326 U;
Glazed fixed frames 60 x 1.20: 220 U;
Reception desks: 3 U;
Wardrobes + storage: 390 m2;
Electric strikes and keys on organigram: set of doors.
False ceilings: 2,734 m
Acoustic wall cladding: 1,808 m
Acoustic fabric sail on glass walls: 440 m
Acrylic paint:
- walls: 9,950 m
- ceilings: 500 m
- ground epoxy paint: 560 m
- doors: 270 m
Mesh nets stainless steel suspended in facades: 1,800 m
Space mesh, trellis, stretched steel cables: 380 m
Embankment facades RDC: 550 m
Landscaping: 30 m