Execution of construction works in Warsaw in the scope of: Construction of individual nodes as part of the decommissioning of the group node — Grochowska 234/240 (no. 39)
A detailed description of the subject of the contract includes:
project documentation and formal and legal documentation,
technical specification for the performance and acceptance of construction works contained in Part III of the SIWZ.
Execution of construction works in Warsaw in the scope of: Construction of individual nodes as part of the decommissioning of the group node — Grochowska 234/240 (rej. 39) As part of the task: Construction of 113 individual nodes as part of the decommissioning of 13 group nodes. Within the framework of the project: Decommissioning of group nodes together with the construction of heating network and individual heat hubs in areas of compact multi-family buildings in areas with exceeded permissible levels of air pollution — Individual nodes for Warsaw — Stage II, Axis Priority And Reducing the emissivity of the economy, Action 1.5 Effective distribution of heat and cold, POIS.01.05.00-00-0034/16.