Civil engineering, road and pipe construction work according to AGFW regulations, including the delivery of the plastic jacket pipe system for connecting a chemical site to the district heating network in Düsseldorf-Süd. Completion of the route by 31.12.2023 at the latest.
Construction phase 1Construction of a fer-heating terrace in the city of Düsseldorf from Benrodestraße via Schöne Aussicht to Bonnerstraße.
1250m route DN350
Construction phase 2Construction of a district heating route in the city of Düsseldorf along Bonner Straße.
1200m route DN350; 1x traverse train tracks (trenchless laying)
Construction phase 3Manufacture of a district heating circuit in the city of Düsseldorf from Bonner Str. via Am Langen Weiher and Ritastraße to the factory premises of Henkel AG & Co. KGaA.
830m route DN350, 470m route DN400, 3x tram crossing (trenchless laying)