Residenz Ansbach, renovation of roofs and facades, construction phase 4, here: plastering and painting work façade
Plaster, stucco and painting work:
1300 m2 of protective measures
600 m2 of substrate pre-treatment cleaning 700 m2 of levelling plaster
600 m2 concealed lime
600 m2 Kalkfeinputz
200 m2 Sockelputz
400 m2 Bossenputz
230 m2 Felderputz
200 m2 desalination
350 m2 silicone resin paint translucent façade 250 m2 silicate paint façade