The regional branch Ostwestfalen-Lippe is planning the repair of the Weser bridge as part of the L 770 between Petershagen and Lahde.
Object and structural planning for the upgrading of the construction as well as the repair of the substructures and superstructures and planning of the traffic systems, including technical articles on water technology.
In detail:
1) Object and structural planning, including technical articles on water technology, as well as planning the traffic systems for the basic determination, preliminary planning and design (service phases 1 - 3) including Investigation of variants with regard to the type, construction and position of the reinforcements, caps with railings, passive protective devices and drainage as well as concrete repair of the substructures and superstructures
2) Object and structural planning, including technical articles on water technology, as well as planning the traffic systems for the approval and implementation planning and for the preparation of the tender documents (service phases 4 - 6);
3) Land use taking into account ecological boundary conditions / requirements;
4) Concept of construction roads and traffic management in all construction phases;
5) Presentation of all overall measures in combined planning documents.