- Delivery and installation of field devices
- Supply and installation of automation equipment
- Wiring, parameterization and programming BACnet IP, BACnet MS/TP, Modbus bus system
- Meter value acquisition via M-Bus incl. line structure and programming
- Control and evaluation of hygienic flushing stations
- Individual room control via room temperature sensor and FBH with I/O BACnet modules
- Control and evaluation of heat pumps and gas peak load boilers via Modbus.
- Control and evaluation of decentralised and centralised ventilation units via BACnet IP
- 1:1 data point test, commissioning and trial operation of the plant.
- Creation, programming and instruction Cloud BMS
- Automation focal points approx. 2 pcs.
- Physical data points approx. 150 pcs.
- Virtual data points approx. 1,500 pcs.
- Cables and electrical wires approx. 1,750 m
- Dynamic overlays approx. 7,000 pcs.
- Attachment / graphic images approx. 250 pcs.
- Decentralised ventilation units approx. 57 pcs.
- Central ventilation units approx. 4 pcs.
- Hygienic rinses approx. 11 pcs.
- Fire dampers approx. 32 pcs.