The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
In advance, an existing building was demolished (school prefabricated building) and a construction site clearing with Flächenentsiegelung and area leveling carried out.
Delivery and installation at school:
- Delivery and installation of 4 specialist cabinets for every 30 pupils including tables,
- Construction of 4 pieces of teacher's experiment tables and 5 pieces of laboratory workstations in the preparation rooms with the necessary laboratory cabinets.
- Supply and installation of distribution systems and supply connections.