1. The Ordering Party shall not allow the possibility of submitting partial tenders.
The contracting authority divided the order into tasks in order to improve the process of settlement and acceptance of works
Task 1: Modernization of the ICT network, Computer hardware, System and utility software.
Task2: Modernization of the HIS system (Helth Information System) white part, e-services on-line, Training in the use of HIS.
The detailed scope of requirements for is described in Annex 2 to the SWZ.
As part of the services of configuration and installation of the supplied software, the Employer requires:
- Preparation of the Order Execution Plan document,
- Installation and configuration of the supplied hardware and software
- Reconfiguration of your data processing environment
- execution of as-built documentation;
After wyk. The Contractor will be obliged to provide warranty service and update care for a period of not less than 12 months (in accordance with the Contractor's offer) from the date of signing the Final Acceptance Act.
Part 1
1.1 Core 2 Switches
1.2.1 Distribution switches type A 10
1.2.2 Distribution switches type B 5
1.3 Access Point-y sieci WiFi 40
1.4 Application Server 1
1.5 File Server 1
1.6.1 PCs type A 10
1.6.2 PCs type B 27
1.6.3 PCs type C 3
1.7 A4 20 Printers
1.8 Server Operating System 4
1.9 600 Server Access Licenses
Part 2
2.1 Modernization of the HIS system part II white 1
2.2. On-line e-services 1
2.3 Training with HIS 1