Cleaning work inside Lot 11.
- construction site equipment with rolling stands and trestles,
- preparatory work - eg sweeping the walls,
- Spritzbewurf 50% opaque - Old building 5 640 m
- Basic u. Leveling plaster 2-ply, as lime plaster - old building 6 290 m
- Lime cement plaster, 1-ply, Q2, stripped and felted - new building 3 710 m
- Putzarmierung, glass fiber fabric - old building 2 010 m
- Fire protection plaster on steel girders F90, small area - old building 40 m
- Interior insulation made of calcium silicate, small area - old building 210 m
- Interior insulation made of PUR panels, small area - old building 40 m
- plaster subsequent slots and openings,
- subsequent slick smoothness, Q3 with burn-on barrier - old building 4 190 m