LV 3021 Earthworks and sewer works
Preparation of an excavation pit with 6500 m³ of excavated soil
Removal and disposal of the above-mentioned soils of the LAGA assignment Z1.2, Z2 and>Z2
Construction of 3200 m² construction roads and working levels made of RC 0/32 with 30cm thickness
1500 m³ foundation excavation and workspace backfilling
400 m of ground pipeline laying below the base slab
550 m Laying of cable ducts under the base slab