Building design according to Part 3, Section 1 HOAI for the renovation and partial new construction of the property Marktplatz 9, Thurnau (former bakery Gräf) to the castle hotel as a component (BT) 1 (client Markt Thurnau). The renovation of the castle Thurnau, market square 1, Storchenbau, Kemenate, probably 2 to 3 floors - further floors after securing the financing and vaulting as a component (BT) 2 and the renovation / technical conversion of the buildings Oberer Schlosshof as a component (BT) 3 (Client Gräflich Giech'sche Spitalstiftung). The 3 components, as described above, are billed as 1 action. The building embraces market square 9 and the restoration of the connections of building elements 2 and 3 to the property boundaries are added to the building costs.
The object planning buildings according to § 34 HOAI for the partial new construction of the component 1, and renovation of the building of the components 1 to 3 are to be commissioned. For component 1 the performance phases 3 to 9, for the components 2 and 3 the performance phases 1 to 9.
Upon conclusion of the contract, a section-wise or component-by-component and step-by-step commissioning is agreed. The respective construction phases are expected to be components 1 to 3. Further subdivision is reserved. Power stage 1 includes power phases 1 and 2 for components 2 and 3. Power stage 2 comprises power phases 3 and 4 for all components, power stage 3 power phases 5 to 7 and power stage 4 power phases 8 and 9. The building substance to be processed is specified / requested with the request to submit the initial offer. Likewise the special services, these are for the component 1 the examination and recognition of the service phases 1 and 2, the proof of heat, the participation in the fundraising and the monitoring of the removal of defects as special achievement of the achievement phase 9. These are called up as required. Proof of preventive fire protection is the basic service of work phases 3 and 4 (part of the building permit), a basic fire protection concept for components 2 and 3 is available. The test expert fire protection is commissioned on site. In detail, the buildings or parts of buildings to be processed are to be taken from the site plan enclosed with the call for tenders or the description. In the case of the services, the partial demolition of the building is to be considered for the marketplace 9. The contract period does not include the services of the performance phase 9 and the special services of the Lph 9, which are commissioned beyond the basic services. The order value and the term are forecast values.