Multi-awarding framework agreement for environmental study services for all SHEM sites.
Duration of 3 years renewable 1 time for 3 additional years.
Realization of ecological continuity study files
Realization of execution files and authorization of works
Preparation of operating permit renewal files
Realization of end-of-concession files
Environmental assistance:
- I2M2 sampling
- Hydromorphological terrain measurements
- Flow measurements with electromagnetic currentometers
- Flow measurements with Doppler current meters
- Definition Minimum Biological Flow EVA method
- Definition Minimum Biological Flow Method
- Definition Minimum Biological Flow Method
- Hydromorphological report
- PE emptying follow-up
- Maintenance of water intakes
- Classical sediment analysis
- Classical sediment + micropollutants analysis
- Conventional water analysis
- Conventional + bacteriological water analysis